Georgia · Kitchen · Free 2026 permit-fee estimator
Kitchen permit cost in Georgia
On a typical $35,000 kitchen project, Georgia's statewide median building permit fee is $490 — about 1.40% of cost. Top Atlanta metros run higher.
Your project cost
Leave blank to use the typical kitchen value, or enter your quote to refresh all metro fees below.
Georgia statewide median
$490
≈ 1.40% of $35,000 project cost
Range: $65 (min) – $1,200 (max)
Top 3 Georgia metros — actual permit fee
The state base × project type stays the same; the metro multiplier is where the swing comes from.
Atlanta
$637
Metro multiplier: 1.3× statewide base
Savannah
$515
Metro multiplier: 1.05× statewide base
Augusta
$465
Metro multiplier: 0.95× statewide base
Georgia permit-fee context
Atlanta + suburbs run 1.2%; rural counties flat-fee $50-$200 for residential.
Why kitchen? Triggers building + plumbing + electrical + (sometimes) mechanical permits — 4 separate fee lines bundle to a higher total.
What this fee does NOT include
- Plan-review service fees (typically 0.5–1% of cost, separate line)
- Per-trade fees (plumbing, electrical, mechanical — $50–$200 each)
- State-level surcharges (FL DBPR, NJ DCA, OR BCD, etc.)
- Contractor's filing/processing fee
Rule of thumb: budget 1.5–2× the base permit fee for the all-in cost.
Compare kitchen remodel in Georgia across all lenses
4 sister tools · same project, same stateBefore you sign, run the 4 other state-aware lenses for the same project.
FAQ — Kitchen permits in Georgia
How much is a kitchen permit in Georgia in 2026?
On a typical $35,000 kitchen project in Georgia, the statewide median permit fee runs $490 — about 1.40% of project cost. Major metros run higher: Atlanta $637, Savannah $515, Augusta $465. Atlanta + suburbs run 1.2%; rural counties flat-fee $50-$200 for residential.
Why is the fee higher in major Georgia metros?
Each Georgia city/county sets its own multiplier on top of the state base rate. Atlanta runs 1.3× because of stricter plan review + structural review + energy-code overhead. Augusta sits lower (0.95×) because of less plan-review depth + simpler intake. Rural counties in Georgia often have flat-fee schedules below even the lowest metro.
What's included in the permit fee vs. what's billed separately?
The permit fee covers the building department's intake + base review. NOT included: plan-review service fees (often a separate line, 0.5–1% of project cost), per-trade fees for plumbing/electrical/mechanical (typically $50–$200 each), and any state-level surcharges (FL adds DBPR 1.5%, NJ adds DCA, OR adds 12% BCD surcharge). Your contractor's filing fee is also separate. Budget 1.5–2× the base permit fee for the all-in cost.
Can I skip the permit and save the fee?
Don't. Working without a required permit fails any future resale inspection (the buyer's inspector WILL flag it), voids your homeowner's insurance for any related claim, and triggers retro-permitting fines that are typically 2–3× the original fee. Georgia treats unpermitted kitchen work as a separate violation under state building code. The "savings" become a $1,500 problem at resale on a $500 fee.
Other projects in Georgia
Disclaimer: Permit fees are jurisdiction-specific and change frequently. These values are 2026 medians — verify against your local building department's current fee schedule before budgeting.