Utah · Kitchen · Free 2026 permit-fee estimator

Kitchen permit cost in Utah

On a typical $35,000 kitchen project, Utah's statewide median building permit fee is $588 — about 1.68% of cost. Top Salt Lake City metros run higher.

Your project cost

Leave blank to use the typical kitchen value, or enter your quote to refresh all metro fees below.

Utah statewide median

$588

≈ 1.68% of $35,000 project cost

Range: $85 (min) – $1,500 (max)

Top 3 Utah metros — actual permit fee

The state base × project type stays the same; the metro multiplier is where the swing comes from.

Salt Lake City

$706

Metro multiplier: 1.2× statewide base

Provo

$676

Metro multiplier: 1.15× statewide base

Ogden

$617

Metro multiplier: 1.05× statewide base

Utah permit-fee context

Salt Lake City + Provo mid-tier; rural counties flat-fee. DOPL adds 1% surcharge on most permits.

Why kitchen? Triggers building + plumbing + electrical + (sometimes) mechanical permits — 4 separate fee lines bundle to a higher total.

What this fee does NOT include

  • Plan-review service fees (typically 0.5–1% of cost, separate line)
  • Per-trade fees (plumbing, electrical, mechanical — $50–$200 each)
  • State-level surcharges (FL DBPR, NJ DCA, OR BCD, etc.)
  • Contractor's filing/processing fee

Rule of thumb: budget 1.5–2× the base permit fee for the all-in cost.

Compare kitchen remodel in Utah across all lenses

Before you sign, run the 4 other state-aware lenses for the same project.

FAQ — Kitchen permits in Utah

How much is a kitchen permit in Utah in 2026?

On a typical $35,000 kitchen project in Utah, the statewide median permit fee runs $588 — about 1.68% of project cost. Major metros run higher: Salt Lake City $706, Provo $676, Ogden $617. Salt Lake City + Provo mid-tier; rural counties flat-fee. DOPL adds 1% surcharge on most permits.

Why is the fee higher in major Utah metros?

Each Utah city/county sets its own multiplier on top of the state base rate. Salt Lake City runs 1.2× because of stricter plan review + structural review + energy-code overhead. Ogden sits lower (1.05×) because of less plan-review depth + simpler intake. Rural counties in Utah often have flat-fee schedules below even the lowest metro.

What's included in the permit fee vs. what's billed separately?

The permit fee covers the building department's intake + base review. NOT included: plan-review service fees (often a separate line, 0.5–1% of project cost), per-trade fees for plumbing/electrical/mechanical (typically $50–$200 each), and any state-level surcharges (FL adds DBPR 1.5%, NJ adds DCA, OR adds 12% BCD surcharge). Your contractor's filing fee is also separate. Budget 1.5–2× the base permit fee for the all-in cost.

Can I skip the permit and save the fee?

Don't. Working without a required permit fails any future resale inspection (the buyer's inspector WILL flag it), voids your homeowner's insurance for any related claim, and triggers retro-permitting fines that are typically 2–3× the original fee. Utah treats unpermitted kitchen work as a separate violation under state building code. The "savings" become a $1,500 problem at resale on a $500 fee.

Disclaimer: Permit fees are jurisdiction-specific and change frequently. These values are 2026 medians — verify against your local building department's current fee schedule before budgeting.