Kitchen permit cost in Minnesota

On a typical $35,000 kitchen project, Minnesota's statewide median building permit fee is $637 — about 1.82% of cost. Top Minneapolis metros run higher.

Your project cost

Leave blank to use the typical kitchen value, or enter your quote to refresh all metro fees below.

Minnesota statewide median

$637

≈ 1.82% of $35,000 project cost

Range: $100 (min) – $1,800 (max)

Top 3 Minnesota metros — actual permit fee

The state base × project type stays the same; the metro multiplier is where the swing comes from.

Minneapolis

$828

Metro multiplier: 1.3× statewide base

St. Paul

$796

Metro multiplier: 1.25× statewide base

Duluth

$637

Metro multiplier: statewide base

Minnesota permit-fee context

Minneapolis + St. Paul use State Surcharge formula on top of municipal fee (0.0005 × valuation min $1).

Why kitchen? Triggers building + plumbing + electrical + (sometimes) mechanical permits — 4 separate fee lines bundle to a higher total.

What this fee does NOT include

  • Plan-review service fees (typically 0.5–1% of cost, separate line)
  • Per-trade fees (plumbing, electrical, mechanical — $50–$200 each)
  • State-level surcharges (FL DBPR, NJ DCA, OR BCD, etc.)
  • Contractor's filing/processing fee

Rule of thumb: budget 1.5–2× the base permit fee for the all-in cost.

Compare kitchen remodel in Minnesota across all lenses

Before you sign, run the 4 other state-aware lenses for the same project.

FAQ — Kitchen permits in Minnesota

How much is a kitchen permit in Minnesota in 2026?

On a typical $35,000 kitchen project in Minnesota, the statewide median permit fee runs $637 — about 1.82% of project cost. Major metros run higher: Minneapolis $828, St. Paul $796, Duluth $637. Minneapolis + St. Paul use State Surcharge formula on top of municipal fee (0.0005 × valuation min $1).

Why is the fee higher in major Minnesota metros?

Each Minnesota city/county sets its own multiplier on top of the state base rate. Minneapolis runs 1.3× because of stricter plan review + structural review + energy-code overhead. Duluth sits lower (1×) because of less plan-review depth + simpler intake. Rural counties in Minnesota often have flat-fee schedules below even the lowest metro.

What's included in the permit fee vs. what's billed separately?

The permit fee covers the building department's intake + base review. NOT included: plan-review service fees (often a separate line, 0.5–1% of project cost), per-trade fees for plumbing/electrical/mechanical (typically $50–$200 each), and any state-level surcharges (FL adds DBPR 1.5%, NJ adds DCA, OR adds 12% BCD surcharge). Your contractor's filing fee is also separate. Budget 1.5–2× the base permit fee for the all-in cost.

Can I skip the permit and save the fee?

Don't. Working without a required permit fails any future resale inspection (the buyer's inspector WILL flag it), voids your homeowner's insurance for any related claim, and triggers retro-permitting fines that are typically 2–3× the original fee. Minnesota treats unpermitted kitchen work as a separate violation under state building code. The "savings" become a $1,500 problem at resale on a $500 fee.

Disclaimer: Permit fees are jurisdiction-specific and change frequently. These values are 2026 medians — verify against your local building department's current fee schedule before budgeting.