North Dakota · Bathroom · Free 2026 permit-fee estimator
Bathroom permit cost in North Dakota
On a typical $15,000 bathroom project, North Dakota's statewide median building permit fee is $180 — about 1.20% of cost. Top Fargo metros run higher.
Your project cost
Leave blank to use the typical bathroom value, or enter your quote to refresh all metro fees below.
North Dakota statewide median
$180
≈ 1.20% of $15,000 project cost
Range: $60 (min) – $1,000 (max)
Top 3 North Dakota metros — actual permit fee
The state base × project type stays the same; the metro multiplier is where the swing comes from.
Fargo
$207
Metro multiplier: 1.15× statewide base
Bismarck
$198
Metro multiplier: 1.1× statewide base
Grand Forks
$171
Metro multiplier: 0.95× statewide base
North Dakota permit-fee context
Fargo + Bismarck mid-tier; rural counties flat-fee residential.
Why bathroom? Plumbing + electrical permits required; building permit only if walls move. Mid-range fee weight.
What this fee does NOT include
- Plan-review service fees (typically 0.5–1% of cost, separate line)
- Per-trade fees (plumbing, electrical, mechanical — $50–$200 each)
- State-level surcharges (FL DBPR, NJ DCA, OR BCD, etc.)
- Contractor's filing/processing fee
Rule of thumb: budget 1.5–2× the base permit fee for the all-in cost.
Compare bathroom remodel in North Dakota across all lenses
4 sister tools · same project, same stateBefore you sign, run the 4 other state-aware lenses for the same project.
FAQ — Bathroom permits in North Dakota
How much is a bathroom permit in North Dakota in 2026?
On a typical $15,000 bathroom project in North Dakota, the statewide median permit fee runs $180 — about 1.20% of project cost. Major metros run higher: Fargo $207, Bismarck $198, Grand Forks $171. Fargo + Bismarck mid-tier; rural counties flat-fee residential.
Why is the fee higher in major North Dakota metros?
Each North Dakota city/county sets its own multiplier on top of the state base rate. Fargo runs 1.15× because of stricter plan review + structural review + energy-code overhead. Grand Forks sits lower (0.95×) because of less plan-review depth + simpler intake. Rural counties in North Dakota often have flat-fee schedules below even the lowest metro.
What's included in the permit fee vs. what's billed separately?
The permit fee covers the building department's intake + base review. NOT included: plan-review service fees (often a separate line, 0.5–1% of project cost), per-trade fees for plumbing/electrical/mechanical (typically $50–$200 each), and any state-level surcharges (FL adds DBPR 1.5%, NJ adds DCA, OR adds 12% BCD surcharge). Your contractor's filing fee is also separate. Budget 1.5–2× the base permit fee for the all-in cost.
Can I skip the permit and save the fee?
Don't. Working without a required permit fails any future resale inspection (the buyer's inspector WILL flag it), voids your homeowner's insurance for any related claim, and triggers retro-permitting fines that are typically 2–3× the original fee. North Dakota treats unpermitted bathroom work as a separate violation under state building code. The "savings" become a $1,500 problem at resale on a $500 fee.
Other projects in North Dakota
Disclaimer: Permit fees are jurisdiction-specific and change frequently. These values are 2026 medians — verify against your local building department's current fee schedule before budgeting.